Pierce ABS1K Bale Spike Installation Overview

Install the PIERCE ABS1K bale spike with these easy instructions. This article is an overview transcript of the PIERCE hydraulic bale spear installation process. Read on for instructions and watch the how-to video below. 

PIERCE ABS1K and ABS3K Hydraulic Bale Spike Installation Overview:

Step 1 – Remove the tailgate.

Step 2 – Choose your mounting option: single collar or double collar. Today we are using a double collar.

Step 3 – Secure the collar with the 3/4” bolts using a 1 1/8” wrench. The location of the collar can be adjusted as needed.

Step 4 – Lift the bale spike using an overhead chain hoist.

Step 5 – Attach the bale spike to the 2 5/16” gooseneck ball. Adjust to fit the bed and collar.

Step 6 – The CPO77K remote is pre-wired to the pump and can be threaded through the rear cab window. A wireless remote can eliminate this step. The electrical connections include a positive and negative wire to the battery. We used PIERCE quick connects to make this process simple. Quick connects are pre-installed to the pump. A twin connect is installed to the battery.

Step 7 – Add the 150 amp breaker in-line on the positive side.

Step 8 – Lastly, add the two bale spears using the two provided pins.

Now you’re ready to haul hay to your hungry herd!

Share on facebook
Facebook
Share on google
Google+
Share on twitter
Twitter
Share on linkedin
LinkedIn
Share on pinterest
Pinterest

Free Shipping

  • Order Subtotal over $99
  • Order weight under 120 lbs.
  • Contiguous United States (Not Hawaii or Alaska)

Please note that items such as our dump kits or hay bale spikes may have free shipping promotions that are valid despite being over the stated 120 lb. limit shown here.

{"cart_token":"","hash":"","cart_data":""}